Here is the translation of the text from Bulgarian to English: --- The apartment consists of a living room with a terrace, two bedrooms (one with a terrace), a bathroom with a toilet, a corridor, and a cellar. The total area is 121.42 square meters, with a built-up area of 98.10 square meters. The property is part of a newly constructed residential building project located in the center of Plovdiv, featuring apartments, commercial spaces, garages, and parking lots. It boasts an excellent location with no possibility of overshadowing from any direction. It's close to shops and restaurants like "Life" in Plovdiv, accessible via city transport (electric) without noise or emissions, near a park by Hristo Smirnenski school, and within 10-15 minutes on foot from the Medical University. The property is situated at the intersection of two streets, with direct access to the garage entrance from the main street and pedestrian access to the residential section via a secondary street, offering parking space near and in front of the entrance. The building comprises one section for garages and parking spaces, including an elevator. More details can be reviewed in the attached files showing the layout or by visiting our offices. Heating options for the apartment include gas and/or electricity (climate control). The project features excellent execution of common areas and facades, as shown in the provided visualizations! Apartment layouts vary depending on the selected area, with one covered floor offering a great view in all directions. The building will be constructed using top-quality materials: Wieneberger and PVC five-chamber German profile with double or triple glazing and multi-glazed units. The facade includes thermal insulation and paint—complete systems from Ceresit or Baumit, combined with designer facades and roofing elements of high quality. Modern entrance doors with all protections are included, along with lighting in common areas, customizable interior doors upon client's choice, video intercom systems, video surveillance, hydraulic or electric elevators, and various payment plans with residual value until the issuance of ACT 16. The project began in September 2021 with actual construction and sales underway. EA 4530 ---
Compare listings
Compare